PROPELLER MAINTENANCE PROJECT – BA SON SHIPYARD
1. Project Introduction
The propeller maintenance project was carried out by ATLAS Mechanical & Engineering Co., Ltd. under a contract signed with Ba Son Shipyard – Ba Son Corporation (Ministry of National Defense). The project included disassembly, inspection, restoration, and maintenance of propeller systems for submarines and high-capacity surface vessels.
2. Project Details
- Investor: BA SON SHIPYARD
- Contractor: ATLAS Mechanical & Engineering Co., Ltd.
- Location: Ho Chi Minh City
- Scope of work:
- Disassembly and reassembly of the propeller system, overall mechanical inspection
- Cleaning and ultrasonic inspection of propeller blades and bearings
- Replacement and restoration of worn components, bushings, and sealing gaskets
- Application of protective anti-corrosion coatings
- Installation, alignment, and technical acceptance
- Technical standards: As required by the Vietnam Register (VR)
- Implementation time: 20 days
3. Results & Evaluation
- The project was executed safely, accurately, and in accordance with military technical standards.
- After maintenance, the propeller system operated stably with no abnormal vibrations detected.
- Ba Son Shipyard highly appreciated the service quality and the responsibility of the ATLAS engineering team.
4. Project Photos


Other Projects

PYROLYSIS FURNACE INSTALLATION PROJECT – RUBBER TIRE PLANT IN PHU MY
2 min read

FABRICATION & INSTALLATION OF FACTORY STRUCTURE IN PHU MY – BA RIA VUNG TAU
1 min read

Design, Fabrication, and Installation of a Chemical Dosing System for Vinh Duc Rubber Factory – Long An
1 min read

PROJECT: DESIGN OF A RUBBER PYROLYSIS PLANT IN CHAU PHA, TOC TIEN, PHU MY, BA RIA – VUNG TAU Executed by ATLAS Mechanical & Engineering Co., Ltd
2 min read